Renovation Process

We take care of everything, start to finish

MasterCraft have fine-tuned and perfected their renovation process to ensure a smooth, efficient project and a premium quality finished bathroom. We take you through the whole bathroom renovation , step by step and keep you informed along the way.

You’ll probably find that most other bathroom renovation companies don’t include all the services that MasterCraft do, this is what sets our team of professionals apart from the rest. Find out more about our complete bathroom renovations .


Make safe of electrical and plumbing cap off

The first step in the renovation process is ‘make safe of electrical and plumbing cap off’. This step involves disconnecting the power and water to the area. This happens prior to the strip out process.

Asbestos testing and removal

Asbestos testing is a process where a sample of the area is taken for lab testing this is normally done before any work proceeds.

MasterCraft will always check the age of the house and material used in its construction during the site inspection. If we suspect an area contains asbestos, we will organise for asbestos testing to be carried out.

General rules for asbestos:

  • If your home was built in the 1980s or earlier, it is highly likely to contain asbestos.
  • If your home was built between 1980-1990 it is likely to have some asbestos present.
  • If your home was constructed between 1990-2003, it is unlikely to contain asbestos. However, if asbestos is suspected we will have it tested.

Asbestos removal requires the entire room to be ripped out. This includes all walls, cornice, ceiling and architraves, right back to the studs.

MasterCraft enlists a professional asbestos removal specialist for this stage of the process. You will need to be out of the property during this process.

Demolition – strip out and dust management

A strip out is the process where all the fittings and fixtures, tiles, mirror, shower screen, toilet, bath, sheeting, are completely removed back to the studs and original flooring. Alternatively, if the room has block walls, back to the render (in some cases the render is removed as well).

The strip out stage is also when all the preparation for the new design is done by removing walls and preparing to relocate plumbing and electrical systems.

Block walls require a channel to be cut into the wall to fit the new plumbing and electrical infrastructure.

It is important to have all your electrical items, furniture, air-conditioning vents and doors covered and closed before the renovation starts. This is to prevent fine dust particles created during the renovation from travelling through the air and on clothing when opening and shutting the door to the work area. We utilise extractor fans to manage and reduce the dust during the project.

Drop sheets are also used to protect the flooring around the bathroom.

However, even with all the precautions we take there can be small amounts of dust throughout any renovation. We endeavor to keep the dust as minimal as possible at all times to reduce the disruption to your home.

Concrete cutting and core drilling

If your renovation requires moving the shower, vanity, bath, or toilet to a different location in a bathroom the concrete will be required to be cut through the concrete slab to allow the relocation of the plumbing for the new waste points.

Pest control termite barrier

When the concrete has been cut to relocate the plumbing, if the cuts penetrate the slab, a termite barrier installation is required. There are two ways this process can be done a treated membrane can be installed over the concrete or a barrier is installed to the edge of the slab before the concrete is poured.

Concreting

After the termite treatment has been completed the concreting is repaired.

Electrical rough in and fit off

Electrical rough-in is carried out when adding wiring for new lighting or relocating light switches and power points.

Fit-off is done after all the installation of all the new lining finishes has been completed (tiles sheeting).

Plumbing rough-in and fit-off

The plumbing rough-in is required when wastes and water are relocated or adjusted for the shower, vanity, bath, or toilet. The old plumbing in the wall is cut and changed for new fittings to suit new taps/mixers.

Strip drains require moving the waste in the shower.

Carpentry

This is the framing stage, building walls, nib walls, niches, shower seats, ledges, cavity slider doors, door frames, and window frames.

Custom windows - wood or aluminium

Most windows will need to be custom made to fit the space of the existing window. When reducing the size of the window the external wall will need to be repaired. If the external wall is brick matching the brick can be difficult so making the window fit is the ideal option. When adding a window, the space is cut at this stage to fit the new window.

Custom windows can take up to 3 weeks to be manufactured and delivered, so it is important to order the window when planning the renovation, prior to the project starting.

Ceiling insulation

Insulation is installed before the ceiling sheeting is installed. Ceiling insulation prevents heat from the roof entering the house and ensures warmth remains in the house in during winter.

Wall insulation

Wall insulation is installed before the villa board sheeting is complete. This type of insulation helps to insulate against heat and noise.

Sheeting

All the materials used in your bathroom renovation are specifically designed for wet areas. Villa board is used as a wall lining, plasterboard is used for the ceiling, and cement sheet underlay is used over timber flooring.

Custom cabinetry

Pre-made vanities only come in standard sizes and certain designs, when specific sizes and designs are required the cabinetry will need to be custom made. Most cabinetry that needs to fit between two walls has to be custom made fit.

Custom made vanities can take up to 3 weeks to be produced so it is important to order the cabinetry during the planning stage, prior to the project starts.

Custom stone benchtops

Most stone benchtops are custom measured and cut after the cabinetry has been installed. A template is created and then the benchtop is cut to size and holes are cut for the basins and tapware.

Skylights

Skylights are often included in bathroom renovations to allow natural light into the room. They are great for cutting down lighting costs and reducing mould and mildew growth.

Plastering

Once all the sheeting has been completed the joints are taped and sanded ready for painting or tiling.

Rendering

Rendering is carried out if required to repair any damage created from the tile removal or the relocation of the plumbing, water or electrical cables.

Waterproofing

A waterproof membrane is installed to the entire floor and shower walls before the tiling has been started to ensure the bathroom tiles and flooring are watertight.

Tiling

Bedding is the first step of tiling, this creates the correct fall to the waste points (so the water drains off). The floor tiling is then carried out, once this is complete the walls are tiled. After the tiling is done grout and silicone are completed throughout.

Custom made shower screens and mirrors

We have the shower screen and mirror measured after the tiling has been completed to ensure the shower screen and mirror fit perfectly. Pre-made shower screens can present fitting issues.

Painting

Painting is the last step to the bathroom renovation. It is best to paint last to avoid other work damaging the painting.

Builders clean

After all the rubbish is removed from the site, the dust and debris are cleaned from all building surfaces. This is really a first ‘builders clean’ and is standard in building projects.

Top quality bathrooms Brisbane

Get started on your bathroom renovation now contact our team on 0423 373 542 or complete our bathroom renovation quote request form today.

BATHROOM RENOVATIONS FAQ

What is the most expensive part of a bathroom renovation?
Bathroom renovation costs can depend on various factors like: Size of the bathroom Partial or complete renovation Products required – such as if you have a shower, vanity, bath, toilet Style and design you choose – cost of the products and extra labour required to install Structural change...
Bathroom Renovation Steps
Are you planning a bathroom renovation? By having a clear picture of the steps it takes to complete the renovation, you can prepare yourself and make a realistic timeline. Before you begin your bathroom renovation Decide if you need a partial or complete renovation. Plan for everything - des...
How to keep bathroom renovations cost down?
Bathroom renovations can be time-consuming and sometimes expensive! However, there are certain ways in which you can keep your renovation costs down without sacrificing on style and design. Here are some tips to ensure you stay within your bathroom renovation budget while still achieving a reward...

For more in depth bathroom renovations information visit our Bathroom renovations Information page


Our Unique Renovation Process

01

Understanding your needs

We will ask you a series of questions to understand the requirements of your renovation in more detail.

02

Solve your problem

A solution will be established based on your requirements along with an estimate for your project.

03

Design consultation

This is where we go through the style and design elements of your renovation (layout, products, tiles and colour options). We will also assess structural and plumbing changes.

04

Final
selections

After we have created a style and design concept for your renovation, you'll be able to view your products and tiles and make your final selections.

05

Deliver on our promise

We have established an experienced team and implemented systems that have a customer focused approach to deliver a high quality and efficient renovation.

Latest Bathroom Renovation Projects

View all projects

Looking for a quality Bathroom Renovation?

Enquire Now

Meet Our Team

HOW OUR BATHROOM RENOVATION TEAM DELIVER ON OUR PROMISE

  • Efficient quotes
  • Prompt communication
  • On time arrival
  • Well dressed in uniform
  • The use of floor protection during the project
  • A clean and tidy work area
  • Respect for our clients and their property
  • Supervisor point of contact for the project
  • Professional trades that have been through our qualifying process
  • Work carried out in a tradesman like manner
  • Quality control systems and processes
  • Sign off stages and checklists to ensure trades meet our expectations
  • Regular communication
  • Organised and efficient planning for maximum productivity
  • Will always get approval for any variation work before proceeding
  • Workmanship warranty
  • Public Liability Insurance
  • QBCC Home Warranty Insurance

Our latest bathroom reno reviews


  • 19-10-2019

    A truly great experience. From quote to finish the team from Master craft Tiling were easy to work with and professional.

    Julie humphries

    View All Reviews

  • 19-10-2019

    Master Craft have just finished tiling our pool deck and we are extremely satisfied with the quality of their work. The Tiler, Dave, was efficient and on time and his attention to detail was excellent. We would use them again and are happy to recommend their services.

    Steve oldershaw

    View All Reviews

  • 21-10-2019

    We used Mastercraft Tiling to renovate three bathrooms at our property. The whole process, end to end, was exceptional. Raymond was amazing and took real care over every step of the job. All trades involved were excellent to deal with. The job started and finished exactly on time and has exce...

    Ben boyer

    View All Reviews

  • 21-10-2019

    Raymond and Vince were very easy to deal with, and provided great solutions to a tired looking concrete patio. The workmanship is of the highest standard, and the tiled back patio looks amazing. I would highly recommend Master Craft tiling to anyone for their tiling needs. I certainly will be usi...

    George h

    View All Reviews

  • 21-10-2019

    We recently completed an extensive city apartment renovation with the MasterCraft team and couldn’t be happier with the outcome and experience. From the first meeting for quotation to the final walk through the teams attention to detail and high standards was clear. The work was completed on time...

    C martens

    View All Reviews